• Small Camp Authorization Application

  • How large will the camp be?*
  • How long will the camp operate?*
  • No Authorization Required

    Due to the size of this camp and the length of its operation, no approval is needed from the Department of Environmental Conservation.

    Operators are advised to follow the best management practices for small camps.

  • Incorrect Application

    Due to the size of this camp, it does not qualify for the small camp authorization process and must go through standard permitting, plan reviews, and authorizations.

    Refer to the Large Camps webpage for more information.

  • Small Camp Authorization Application

  • Application Instructions

  • 1. Complete all required fields accurately and thoroughly

    2. Review and submit the application

    3. A confirmation email will be sent to the email address listed for the applicant

    4. Staff from the Department of Environmental Conservation will follow up regarding approval and payment


    Note: You can save your application as a draft and return to complete it at another time. To do this, click the "Save" button at the bottom of the application and be sure the email address listed is correct; the system will email you a link to complete your application later.

    • Regulatory Requirements 
    • Review the Small Camps webpage

      This camp is required to follow all requirements for small camps.

    •  Review 18 AAC 31.012(c)(10)

      "A food establishment located within a national park, federal military installation, public health service hospital, or other federal facility where inspections and regulatory oversight are provided by the federal government."

      Note: The federal government does not provide food safety inspections or regulatory oversight for national forests, wildlife refuges, Bureau of Land Management lands, and others.

    • Will the camp be located in a national park or military reservation?*
    • *Please Note*

      Alaska requirements for wastewater, drinking water, and solid waste apply to this camp.

      All required Federal regulations and permits apply to this camp.

      The Alaska Food Code does not apply to this camp because food safety inspections and regulatory oversight are provided by the federal government in these locations.

      Federal food safety requirements must be met.

    • Will the camp be used for oil and gas activities within the boundaries of the North Slope Borough?*
    • *Please Note*

      This camp is regulated under Alaska Pollutant Discharge Elimination System (APDES) general permit #AKG332000 for wastewater treatment and disposal.

      The wastewater system is subject to plan review and approval.

      Alaska requirements for food safety, drinking water, and solid waste apply to this camp.

      The $30 wastewater fee does not apply.

       

    • For the purpose of this application's wastewater regulations, "remote" is defined as an area that:

      • Has no year-round access to a major road system (a system of connected roads with a total length of 100 miles or more); and
      • Is at least 25 road miles away from the nearest community or paved highway.
    • Will the camp be located in a remote location based on the definition provided?*
    • *Please Note*

      This camp will be required to submit wastewater engineering plans for review and approval.

      Visit the Engineered Wastewater Disposal Systems webpage for more information.

    • Physical Location of the Camp 
    • Choose one of the following methods to provide the precise location of the camp as part of this application:*
    • Convert Degrees, Minutes, Seconds to Decimal Degrees

      This resource is provided by the Federal Communications Commission (FCC)

    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • Please indicate the dates the camp will be operating in this location.

      These dates will be used to determine the start and end dates for the authorization.

    • Start Date*
       / /
    • Is there a confirmed date for when the camp will stop operating in this location?*
    • End Date*
       / /
    • End Date*
       / /
    • All small camp authorizations expire on December 31 and must be renewed. A renewal notice will be mailed to the address on file.

      To renew this authorization for the next year, the next year's annual fee must be submitted to the Department of Environmental Conservation. A new application is not required as part of the renewal process if there are no changes from the previous application.

      Please contact the Permit Coordinator for more information.

    • Camp Information 
    • Type of Operation*
    • Format: 000-000-0000.
    • Format: 000-000-0000.

    • Format: 000-000-0000.
    • Format: 000-000-0000.

    • Add another responsible person on-site?*
    • Format: 000-000-0000.
    • Format: 000-000-0000.

    • Is this site leased or permitted?*
    • Format: 000-000-0000.

    • Business Information 
    • Add another owner or corporate officer?*
    • Add another owner or corporate officer?*
    • Format: 000-000-0000.
    • Format: 000-000-0000.

  • Summary of Regulations and Fees

  • Camp Authorization*
  • Camp Authorization*
  • Camp Authorization*
  • Camp Authorization*
  • The camp will be located in a national park or military reservation where food safety inspections and regulatory oversight are provided by the federal government.*
  • The camp will be used for oil and gas activities within the boundaries of the North Slope Borough.*
  • I certify that I am familiar with the small camp requirements and the camp described in this application will be operated and maintained in accordance with the regulations.

  • Would you prefer to sign your signature directly on this form or upload an image of your signature?*
  • Clear
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof

  • Should be Empty: